Rank |
Date |
Location |
Description |
Fatalities |
In 2006 dollars
($ millions) (2) |
1 |
April 26, 1986 |
Kiev, Ukraine |
Mishandled reactor safety test at Chernobyl
nuclear reactor causes steam explosion
and meltdown, necessitating the evacuation of
300,000 people from Kiev and dispersing
radioactive material across Europe
|
4,056 |
$6,700 |
2 |
March 28, 1979 |
Middletown, Pennsylvania,
United States |
Equipment failures and operator error contribute to loss of coolant and partial core meltdown at Three Mile Island nuclear reactor |
0 |
2,400 |
3 |
March 9, 1985 |
Athens, Alabama, United States |
Instrumentation systems malfunction during startup, convincing the Tennessee Valley Authority to suspend operations at all three Browns Ferry Units |
0 |
1,830 |
4 |
February 22, 1977 |
Jaslovske Bohunice, Czechoslovakia |
Mechanical failure during fuel loading causes severe corrosion of reactor and release of radioactivity into the plant area, necessitating total decommission |
0 |
1,700 |
5 |
April 11, 1986 |
Plymouth, Massachusetts, United States |
Recurring equipment problems with instrumentation, vacuum breakers, instrument air system, and main transformer force emergency shutdown of Boston Edison’s Pilgrim nuclear facility |
0 |
1,001 |
6 |
February 1, 2010 |
Montpelier, Vermont, United States |
Deteriorating underground pipes from the Vermont Yankee nuclear power plant leak radioactive tritium into groundwater supplies in Vermont, resulting in the eventual shutdown of the plant |
0 |
700 |
7 |
December 26, 1985 |
Clay Station, California, United States |
Safety and control systems unexpectedly fail at Rancho Seco nuclear reactor, ultimately leading to the premature closure of the plant |
0 |
672 |
8 |
November 24, 1989 |
Greifswald, East Germany |
Electrical error causes fire in the main trough that destroys control lines and 5 main coolant pumps and almost induces meltdown |
0 |
443 |
9 |
March 31, 1987 |
Delta, Pennsylvania, United States |
Philadelphia Electric Company shuts down Peach Bottom units 2 and 3 due to cooling malfunctions and unexplained equipment problems |
0 |
400 |
10 |
September 2, 1996 |
Crystal River, Florida, United States |
Balance-of-plant equipment malfunction forces Florida Power Corporation to shut down Crystal River Unit 3 and make extensive repairs |
0 |
384 |
11 |
May 4, 1987 |
Kalpakkam, India |
Fast Breeder Test Reactor at Kalpakkam has to shut down due to the simultaneous occurrence of pump failures, faulty instrument signals, and turbine malfunctions that culminate in a refuelling accident that ruptures the reactor core with 23 fuel assembles, resulting in a two year shutdown |
0 |
300 |
12 |
February 2, 1995 |
Kota, Rajasthan, India |
The Rajasthan Atomic Power Station leaks radioactive helium and heavy water into the Rana Pratap Sagar River, necessitating a two year shutdown for repairs |
|
280 |
13 |
May 4, 1986 |
Hamm-Uentrop, Germany |
Operator actions to dislodge damaged fuel rod at Experimental High Temperature Gas Reactor release excessive radiation to 4 square kilometers surrounding the facility |
0 |
267 |
14 |
February 20, 1996 |
Waterford, Connecticut, United States |
Leaking valve forces Northeast Utilities Company to shut down Millstone Units 1 and 2, further inspection reveals multiple equipment failures |
0 |
254 |
15 |
March 22, 1975 |
Browns Ferry, Alabama, United States |
Fire burns for seven hours and damages more than 1,600 control cables for three nuclear reactors, disabling core cooling systems |
0 |
240 |
16 |
March 31, 1993 |
Bulandshahr, Uttar Pradesh, India |
The Narora Atomic Power Station suffers a fire at two of its steam turbine blades, damaging the heavy water reactor and almost leading to a meltdown |
0 |
220 |
17 |
December 19, 1987 |
Lycoming, New York, United States |
Fuel rod, waste storage, and water pumping malfunctions force Niagara Mohawk Power Corporation to shut down Nine Mile Point Unit 1 |
0 |
150 |
18 |
February 16, 2002 |
Oak Harbor, Ohio, United States |
Severe corrosion of control rod forces 24 month outage of Davis-Besse reactor |
0 |
143 |
19 |
March 17, 1989 |
Lusby, Maryland, United States |
Inspections at Baltimore Gas & Electric’s Calvert Cliff Units 1 and 2 reveal cracks at pressurized heater sleeves, forcing extended shutdowns |
0 |
120 |
20 |
September 15, 1984 |
Athens, Alabama, United States |
Safety violations, operator error, and design problems force 6 year outage at Browns Ferry Unit 2 |
0 |
110 |
20 |
August 27, 2009 |
St. Petersburg, Russia |
A cracked discharge accumulator and malfunctioning feed pump force the Leningrad Nuclear Power Plant reactor number 3 to close for extended repairs |
0 |
110 |
(1) As of February 2011. Does not include the unfolding March 2011 incident in Japan.
(2) Total economic losses, including destruction of property, emergency response, environmental remediation, evacuation, lost product, fines, and court and insurance claims.
Source: Benjamin K. Sovacool, Contesting the Future of Nuclear Power: A Critical Global Assessment of Atomic Energy (London: World Scientific, 2011). |